background

(AI) Air India 7317 Flight Details

On time | Scheduled

Departure

LHR

London Heathrow Airport, EN, GB

Flight Gate Times

14-Aug-2018

Scheduled

10:05

 BST

Actual

--

Total Departure Delay: -

Flight Runway Times

14-Aug-2018

Scheduled

10:15

 BST

Actual

--

Runway Delay: -

Terminal

2

Gate

-

Craft Type

Boeing 787-9

789

Flight Time

Scheduled

9h 25m

Arrival

YVR

Vancouver International Airport, BC, CA

Flight Gate Times

14-Aug-2018

Scheduled

11:30

 PDT

Estimated

11:30

 PDT

Total Arrival Delay: -

Flight Runway Times

14-Aug-2018

Scheduled

10:45

 PDT

Actual

--

Runway Delay: -

Terminal

I

Gate

D49

Baggage Claim

-

Tail Number

-

Flight Time

Estimated

9h 25m

Flight Notes

Operated by Air Canada 855

Also marketed as (9W) Jet Airways (India) 5055, (LH) Lufthansa 6840, (NZ) Air New Zealand 4825, (OS) Austrian 8211, (SA) South African Airways 7304, (UA) United Airlines 8581, (UL) SriLankan Airlines 2855

Event Timeline

Time

Date

UTC

Event

Data Updated

14 Aug

07:01

Estimated Gate Arrival changed to Aug-14-2018 11:30 AM

Arrival Terminal changed to I

Arrival Gate changed to D49

13 Aug

09:06

Scheduled Runway Arrival changed to Aug-14-2018 10:45 AM

Scheduled Runway Departure changed to Aug-14-2018 10:15 AM

Actual Equipment changed to 789

11 Aug

20:10

11 Aug

20:10

Scheduled Gate Arrival changed to Aug-14-2018 11:30 AM

Scheduled Gate Departure changed to Aug-14-2018 10:05 AM

Scheduled Equipment changed to 789

Departure Terminal changed to 2