background

(TP) TAP Portugal 7039 Flight Details

On time | Departed

Departure

BOM

Chhatrapati Shivaji International Airport, IN

Flight Gate Times

17-Aug-2018

Scheduled

06:30

 IST

Actual

06:36

 IST

Total Departure Delay: 6 mins

Flight Runway Times

17-Aug-2018

Scheduled

--

Actual

06:48

 IST

Runway Delay: -

Terminal

2

Gate

-

Craft Type

Boeing 787-8

788

Flight Time

Scheduled

9h 30m

Arrival

LHR

London Heathrow Airport, EN, GB

Flight Gate Times

17-Aug-2018

Scheduled

11:30

 BST

Estimated

11:28

 BST

Total Arrival Delay: -

Flight Runway Times

17-Aug-2018

Scheduled

--

Actual

--

Runway Delay: -

Terminal

2

Gate

-

Baggage Claim

-

Tail Number

VT-ANN

Flight Time

Estimated

9h 22m

Flight Notes

Operated by Air India 131

Also marketed as (AC) Air Canada 6391

Event Timeline

Time

Date

UTC

Event

Data Updated

17 Aug

01:20

Estimated Gate Arrival changed from Aug-17-2018 11:30 AM to Aug-17-2018 11:28 AM

Estimated Gate Departure changed from Aug-17-2018 6:30 AM to Aug-17-2018 6:36 AM

Actual Gate Departure changed to Aug-17-2018 6:36 AM

17 Aug

01:20

Estimated Runway Departure changed to Aug-17-2018 6:48 AM

Actual Runway Departure changed to Aug-17-2018 6:48 AM

Tail Number changed to VT-ANN

Status changed from Scheduled to Active

Actual Equipment changed to 788

16 Aug

01:06

Estimated Gate Arrival changed to Aug-17-2018 11:30 AM

Estimated Gate Departure changed to Aug-17-2018 6:30 AM

14 Aug

20:11

14 Aug

20:11

Scheduled Gate Arrival changed to Aug-17-2018 11:30 AM

Scheduled Gate Departure changed to Aug-17-2018 6:30 AM

Scheduled Equipment changed to 788

Arrival Terminal changed to 2

Departure Terminal changed to 2