background

(BA) British Airways 8789 On-Time Performance Rating

Date Range:

01-Mar-2025 to 30-Apr-2025

(BOM) Mumbai Chhatrapati Shivaji International Airport

Mumbai, IN

(HYD) Hyderabad Rajiv Gandhi International Airport

Hyderabad, IN

On-Time Performance Chart

(using rounded numbers)
On-Time
46
75%
Late
8
13%
Very Late
5
8%
Excessive
2
3%
Cancelled
0
0%
Diverted
0
0%

Delay Statistics

(Aggregate Arrival Delay Statistics for this Flight)

Total Flights Observed
61
Total Delays ( > 1 min )
36
Codeshares
61
Average Delay (min.)
17.52777777777778
Standard Deviation
17.9
Min
0
Max
71

BA 8789 On-Time Performance Details

Overall Rating
3.0 of 5
Average
Percentage On-Time 75%
Average Delay Time 17.52777777777778 min
FlightStats Rating is a merit measurement considering both on-time performance and delay severity. The score, 3 shows that this flight has on-time performance characteristics better than 58% of all other flights in the FlightStats database.
On-Time Performance Rating
1.2 of 5
Poor
Percentage On-Time 75%
This flight has an on-time performance of 75%. Statistically, when taking into consideration sample size, standard deviation, and mean, this flight is on-time more often than 24% of other flights.
Delay Performance
4.7 of 5
Very Good
Average Delay Time 17.52777777777778 min
This flight has an average delay of 17.52777777777778 minutes with a standard deviation of 17.9 minutes. Statistically, when taking into consideration sample size, standard deviation, and mean, this flight has delay performance characteristics better than 93% of other flights.