background

(BZ*) Blue Dart Aviation 481 On-Time Performance Rating

Date Range:

01-Feb-2024 to 31-Mar-2024

(BOM) Chhatrapati Shivaji Maharaj International Airport

Mumbai, IN

(HYD) Rajiv Gandhi International Airport

Hyderabad, IN

On-Time Performance Chart

(using rounded numbers)
On-Time
19
66%
Late
7
24%
Very Late
3
10%
Excessive
0
0%
Cancelled
0
0%
Diverted
0
0%

Delay Statistics

(Aggregate Arrival Delay Statistics for this Flight)

Total Flights Observed
29
Total Delays ( > 1 min )
23
Codeshares
0
Average Delay (min.)
14
Standard Deviation
11.9
Min
0
Max
44

BZ* 481 On-Time Performance Details

Overall Rating
2.5 of 5
Average
Percentage On-Time 66%
Average Delay Time 14 min
FlightStats Rating is a merit measurement considering both on-time performance and delay severity. The score, 2.5 shows that this flight has on-time performance characteristics better than 49% of all other flights in the FlightStats database.
On-Time Performance Rating
0.3 of 5
Very Poor
Percentage On-Time 66%
This flight has an on-time performance of 66%. Statistically, when taking into consideration sample size, standard deviation, and mean, this flight is on-time more often than 5% of other flights.
Delay Performance
4.7 of 5
Very Good
Average Delay Time 14 min
This flight has an average delay of 14 minutes with a standard deviation of 11.9 minutes. Statistically, when taking into consideration sample size, standard deviation, and mean, this flight has delay performance characteristics better than 93% of other flights.