background

(G8) GoAir 125 On-time Performance Rating

Date Range:

01-Oct-2019 to 30-Nov-2019

(CCU) Netaji Subhas Chandra Bose Airport

Kolkata, IN

(HYD) Rajiv Gandhi International Airport

Hyderabad, IN

On-Time Performance Chart

(using rounded numbers)
On-Time
14
45%
Late
7
23%
Very Late
2
6%
Excessive
7
23%
Cancelled
1
3%
Diverted
0
0%

Delay Statistics

(Aggregate Arrival Delay Statistics for this Flight)

Total Flights Observed
31
Total Delays ( > 1 min )
24
Codeshares
0
Average Delay (min.)
41
Standard Deviation
46.7
Min
2
Max
184

G8 125 On-time Performance Details

Overall Rating
0.1 of 5
Very Poor
Percentage On-Time 45%
Average Delay Time 41 min
FlightStats Rating is a merit measurement considering both on-time performance and delay severity. The score, 0.1 shows that this flight has on-time performance characteristics better than 1% of all other flights in the FlightStats database.
On-time Performance Rating
0.0 of 5
Very Poor
Percentage On-Time 45%
This flight has an on-time performance of 45%. Statistically, when taking into consideration sample size, standard deviation, and mean, this flight is on-time more often than 0% of other flights.
Delay Performance
0.2 of 5
Very Poor
Average Delay Time 41 min
This flight has an average delay of 41 minutes with a standard deviation of 46.7 minutes. Statistically, when taking into consideration sample size, standard deviation, and mean, this flight has delay performance characteristics better than 4% of other flights.