background

(NUA) United Nigeria 511 On-Time Performance Rating

Date Range:

15-Nov-2025 to 15-Jan-2026

(QOW) Sam Mbakwe International Airport

Imo, NG

(ABV) Abuja Nnamdi Azikiwe International Airport

Abuja, NG

On-Time Performance Chart

(using rounded numbers)
On-Time
0
0%
Late
0
0%
Very Late
6
14%
Excessive
37
86%
Cancelled
0
0%
Diverted
0
0%

Delay Statistics

(Aggregate Arrival Delay Statistics for this Flight)

Total Flights Observed
43
Total Delays ( > 1 min )
43
Codeshares
0
Average Delay (min.)
89.79069767441861
Standard Deviation
67
Min
35
Max
354

NUA 511 On-Time Performance Details

Overall Rating
0.0 of 5
Very Poor
Percentage On-Time 0%
Average Delay Time 89.79069767441861 min
FlightStats Rating is a merit measurement considering both on-time performance and delay severity. The score, 0 shows that this flight has on-time performance characteristics better than 0% of all other flights in the FlightStats database.
On-Time Performance Rating
0.0 of 5
Very Poor
Percentage On-Time 0%
This flight has an on-time performance of 0%. Statistically, when taking into consideration sample size, standard deviation, and mean, this flight is on-time more often than 0% of other flights.
Delay Performance
0.0 of 5
Very Poor
Average Delay Time 89.79069767441861 min
This flight has an average delay of 89.79069767441861 minutes with a standard deviation of 67 minutes. Statistically, when taking into consideration sample size, standard deviation, and mean, this flight has delay performance characteristics better than 0% of other flights.